Engineer report

The jobs assigned to one engineer in the period: visits, callbacks, response time and hours on site and travelling.

Where: Finance › Reports › Engineers tableFor Owners, admins, dispatchers

Step by step

  1. Go to Finance › Reports.
  2. Click an engineer's name in the engineers table.
  3. Choose the period.

Tips

  • A high callback share points to repairs that do not hold. Look at the jobs together rather than judging on the number alone.
  • The Engineer productivity table report also shows Escalated (visits handed on to a more experienced engineer) and Took escalations (escalated jobs the engineer fixed). An escalated visit does not count as a first-time fix. Many escalations from one engineer usually means training on that type of fault, not a bad engineer: their lessons are under How it was fixed in the engineer app.